A big tip of the hat goes to Phillip for all his help over the past couple of days. There’s no way I would have been able to get this 316 pound cast-iron tub into place without his help (or have put the plumbing togehter without his tools :)).
5 hours Saturday, 3 hours Sunday.
One reply on “Bathroom, days three and four”
Hi Reeves,
It looks like you’re getting there. Good thing is floor not damage. One day I decided to do a replace our tub, and then I found out tha the floor (under the old tub) is really damaged. It turned out bigger that I thought.
Robert